Sage 100 Contractor Data Mapping

How Sage 100 Contractor employees, jobs, and phases map to ToolWatch employees, cost centers, locations, and cost codes.

The ToolWatch Sage 100 integration is focused on two goals:

  1. To enable personnel to be able to accomplish their job(s) using a single system, whether that system is Sage 100 or ToolWatch

  2. Keep both Sage 100 and ToolWatch data in sync and up to date.

This integration approach assumes that Sage 100 will be used for accounting and project management, and that ToolWatch is used for inventory.

Data Mappings

Sage 100

Sync Direction

ToolWatch

Employees

→

Employees

Jobs

→

Cost Centers

Jobs

→

Locations

Phases

→

Cost Codes


Data Mapping Details

Employees

A ToolWatch Employee will be created for every active employee in Sage. The following fields will be mapped:

Sage 100 Employee

ToolWatch Employee

Notes

Employee Number

Number

First Name

First Name

Last Name

Last Name

First Name and Last Name

Description

The Sage 100 first and last names will be reformatted to match the ToolWatch format of "LastName, FirstName".

Email

Email

Email sync requires the "Populate Employee Email" setting, which is off by default. When it is enabled, emails are still not updated for employees who are ToolWatch users.

Active

Inactive

By default, only active employees are added from Sage 100 (configurable via the "Create new in ToolWatch only if active in Sage" setting). Existing Employees in ToolWatch can be deactivated.


Jobs

A ToolWatch Cost Center will be created for every "in progress" Job in Sage 100. The following fields will be mapped:

Sage 100 Job

ToolWatch Cost Center

Notes

Job

Number

Job Name

Description

The ToolWatch Description is the Sage Job Name.

Status

Inactive

An existing ToolWatch Cost Center will be set to Inactive if the Sage Job Status is not "In Progress".


Locations

By default, a ToolWatch Location will be created for every active Job in Sage 100. This is not strictly necessary in order to properly accrue Job Costs and Billing in ToolWatch, and have those flow back into Sage 100, but it is generally convenient in ToolWatch to be able to assign the assets to the Job when you are going to begin charging the Job for the assets. The Location and Cost Center will be linked in ToolWatch so that by default all assets assigned to the Location are charged to the corresponding Sage Job.

The following fields will be mapped:

Sage 100 Job

ToolWatch Location

Notes

Job Number

Number

Job Number

Barcode

Job Name

Description

The ToolWatch Description is the Sage Job Name.

Address

Address

Address2

Address2

City

City

Zip

Zip

Phone

Phone

-

Cost Center

The Cost Center associated with this Sage Job will be set as the Cost Center for this ToolWatch Location. This means that if assets are transferred to this ToolWatch Location, they by default will be charged to the associated ToolWatch Cost Center (Sage Job), unless the user specifies otherwise.

Status

Inactive

The ToolWatch Location will be set to Inactive if the Sage Job Status is not "In Progress".


Phases

A ToolWatch Cost Code will be created for Phase in Sage for every job imported into ToolWatch. The ToolWatch cost codes will be mapped to the corresponding cost center of the parent job. The following fields will be mapped:

Sage 100 Phase

ToolWatch Cost Code

Notes

Phase Number

Number

Phase Name Description

Description

Status

Inactive

The ToolWatch Cost Code will be set to Inactive if the parent job is not "In Progress".